Hydro-Power Station Trash Cleaner System

Trash Racks

Over time, and especially during the autumn, the amount of rubbish and bio-matter carried down the River Leven and onto the turbine intake grids of the Backbarrow Hydro-Electric power station would become a serious problem is not removed regularly.
At peak times this has to be performed every couple of minutes, while during the spring and summer on a couple of times per day is required.

Blueprint was approached to repair and replace the trash control system used by the station following a failure of the previous system. The existing hardware infrastructure had to be left unchanged, while the logic-controllers were replaced, and the opportunity was taken to upgrade the systems functionality.

During the consultation and design process with our clients, new features were added to improve the system performance, and reduce operating overheads of the plant, including…